A localized fire broke out on a major television production set at the iconic Film City complex in Goregaon, Mumbai, causing material damage to temporary set structures before being brought under control. Emergency response units and local fire brigades dispatched to the location quickly extinguished the flames, preventing the fire from spreading to neighboring studio floors and surrounding facilities. Studio representatives and production personnel confirmed that all crew members and cast present on location were safely evacuated without any reported injuries. Following the incident, the All India Cine Workers Association (AICWA) issued a formal request calling for comprehensive electrical and structural safety audits across all active filming sets in the area. Industry analysts and studio union officials emphasized that enforcing strict fire safety protocols and regular equipment inspections remains critical for protecting crew members, maintaining continuous production schedules, and safeguarding infrastructure across India's busiest film making hubs.

Emergency Response Extinguishes Level-1 Fire Within 50 Minutes

A localized fire broke out inside a temporary production control structure located behind the Prime Focus and Reliance MediaWorks studio facilities within Dadasaheb Phalke Chitranagari (Goregaon Film City). Reported at approximately 4:02 PM, the blaze produced visible plumes of thick smoke over the complex, prompting immediate panic among nearby shooting crews and studio personnel before emergency services secured the site.

Personnel from the Mumbai Fire Brigade, Brihanmumbai Municipal Corporation (BMC) Ward Control, local police, and 108 Ambulance services were deployed to the scene. Firefighters successfully contained and completely extinguished the Level-1 blaze by 4:55 PM, preventing flames from spreading to adjacent indoor sound stages or post-production facilities. Authorities confirmed that no crew members or studio staff sustained injuries during the incident.

Overview: Incident Details and Equipment Impact Assessment

Incident ParameterOfficial Status & Fire Brigade Metrics
Incident Location100 ft × 20 ft PCR Unit behind Prime Focus Studio, Goregaon (East)
Alert & Control TimeReported at 4:02 PM • Fully extinguished by 4:55 PM
Casualties / InjuriesZero reported (Site evacuated successfully)
Damaged InventoryElectrical wiring, cables, AC units, sound gear, wooden planks, & bamboo
Primary RespondersMumbai Fire Brigade, Local Police, BMC Ward Control, 108 Ambulance

Property Damage and Electrical Wiring Vulnerabilities

According to preliminary reports from the Mumbai Fire Brigade, the fire was confined to a 100 ft × 20 ft temporary Production Control Room (PCR) set up to support ongoing feature film and television shooting schedules in the vicinity. The damage was restricted to internal electrical wiring, power cables, air conditioning units, audio-visual sound systems, wooden scaffolding, and temporary plastic fitting materials.

Film City Incident Response & Inspection Workflow: ------------------------------------------------- Level-1 Fire Reported (4:02 PM) ──> Multi-Agency Evacuation & Control (4:55 PM) ──> Electrical & Material Audit ──> Mandatory Safety SOP Enforcement

Initial investigations point to a potential short-circuit within temporary electrical distribution panels as the primary trigger, highlighting long-standing vulnerabilities in high-wattage power lines used across outdoor sets.

MFSCDC and Civic Authorities Order Mandatory Studio Audits

Following the incident, the Maharashtra Film, Stage & Cultural Development Corporation (MFSCDC), which oversees operations at Film City, announced an immediate review of fire safety protocols across all leased sets and studio floors. Production houses operating within the complex have been directed to strictly verify compliance with established Standard Operating Procedures (SOPs) regarding heavy electrical wiring, fire-retardant structural materials, and accessible exit routes.

Civic fire officials emphasized that routine inspections will be conducted across temporary shooting structures to verify the availability of functional fire extinguishers, trained safety officers, and valid NOC certifications, ensuring that studio operations continue without endangering cast and crew safety.